         DT Solar installed one of the first LG Chem battery systems in West Virginia. Definitely a huge milestone for the company and a statement in the solar industry.


How long did it take?


The actual install only took 3 days. But working out the kinks a getting a special breaker made it take a little longer. Being one of the first has its drawback's. But now that we've done one; it should take 3 days to do the entire system.


20 Solar panels w/ Optimizers, 5.7kW

Storedge Inverter

LG Chem Battery

Sub-panel

Conduit burial

A lot of EMT conduit